The GCON GF-342 Training Table is a functional, stable, and versatile furniture solution engineered for professional hospitality and conference environments. Designed with a foldable and stackable structure, this movable long desk maximizes space efficiency and allows for dynamic room reconfigurations. The table is built with a durable metal frame for long-term reliability in high-use settings, and it includes an integrated metal shelf for convenient storage alongside a front privacy panel that ensures a professional aesthetic.
Space-Saving Design: The table is both foldable and stackable, allowing for rapid storage and flexible room layout adjustments.
Enhanced Mobility: Engineered for high-traffic training and conference environments, enabling effortless movement and setup.
Durable Construction: Features a robust, stable metal frame designed to withstand the rigorous demands of daily commercial use.
Integrated Storage & Privacy: Equipped with a built-in metal shelf for personal item storage and a front privacy panel to provide comfort and a clean, professional finish.
Mobile Folding Training Table
The metal frame is durable and stable, and it includes a metal shelf for storing items and a privacy panel in front.
Foldable & Movable Design
When folded, the training table takes up minimal space and can be stacked to the side. It comes with four chairs, and despite the metal frame being somewhat heavy, it can be easily moved anywhere.
Storage Shelf & Privacy Panel
In addition to the large tabletop, the training table features a privacy panel, similar to most office furniture, ensuring users' privacy. It also includes a shelf for storing items.
Product Parameters
|
Model |
GF-342 |
|
Standard Size |
1400 W x 450 Dx 750 H |
|
Main Material |
Stainless Steel & CARB P2 Panel |
|
Customization |
Full OEM & ODM Service |
|
Material Options |
MDF, MFC, Plywood, Solid Wood, Glass, Marble, Metal, and More |
|
Product Finish Options |
HPL, Melamine, Veneer, PVC, Painted, etc. |
|
Sample Price |
1.5 times factory price, refundable after mass production orders. |
|
Sample Lead Time |
7 - 14 Days, depends on sample complexity. |
Contact Us to Elevate Your Projects